About the Project
Roma Hospital, is an esteemed healthcare institution that has recently undergone an impressive $180 million construction project to enhance its facilities. The brand new facilities at Roma Hospital are a testament to the commitment to providing exceptional healthcare services to the community.
Â
The substantial investment in the hospital’s infrastructure has allowed for state-of-the-art advancements in medical technology, expanded treatment areas, and improved patient comfort. The modern design and construction of the facilities reflect the latest trends in healthcare architecture, ensuring a welcoming and efficient environment for patients, staff, and visitors.
Equipment List
- Electrolux Air-O-Steam 10 tray Combi Ovens x 2
- Reverse Osmosis Water Treatment Systems x 2
- Electrolux Electric Cooktop
- Electrolux Rack Conveyor Dishwasher with Dryer
- Irinox 5 Tray Blast chiller / freezer
- SKOPE Upright display chillers TME650N-A
- SKOPE FDM1200 Cold Display Cabinet
- Culinaire Bain Marie Hot Cupboard with 2 Tier Heated Gantry
- Culinaire Mobile Plate Warmers
- Pronto High Speed Oven
- Asko Domestic wall canopy
- Electrolux Domestic Dishwashers
- Miele Electric Ceramic Cooktops
- Westinghouse Domestic ovens
- Various other benchtop equipment
- WEGA Polaris Tron 3 Group Coffee Machine
- BNZ Coffee Grinder
- Robot Coupe Planetary Mixer 20Litre
Solution
The new Roma hospital build was part of the Queensland Government’s $180 million enhancing Regional Hospitals program and is being built specifically to meet the needs of the region. The location of this project is 6 hours from Brisbane so it was very important that all equipment was received, un-crated and prepped well before delivery was scheduled. Commissioning and staff training was also planned well in advance. All of the domestic appliances were also supplied to site for the satellite kitchens, staff canteen and training centre. Hospitality Superstore staff supervised all delivery and staff training.




